miyako-bridges
24°48′ N 125°16′ EHard HardRoadE-bikeloop
KonbiniWaterTop of chart 100 m
Routed over OpenStreetMap with BRouter fastbike-asia-pacific, measured against AWS Terrarium z13 (2026-10-09). The waypoints run as described. 1.5 km crosses bridges, where we bridge the elevation over the water.
Wind at Miyakojima, JMA 1991–2020
Which way to ride, month by month風
Jan
NNE 4.9
Either way
Feb
NNE 4.8
Either way
Mar
NNE 4.6
Either way
Apr
S 4.4
Either way
May
S 4
Either way
Jun
SSW 4.5
Either way
Jul
SSW 4.4
Either way
Aug
S 4.2
Either way
Sep
NE 4.6
Either way
Oct
NE 5.3
Either way
Nov
NE 5.2
Either way
Dec
NNE 5.3
Either way
Arrows point the way the wind blows. Speeds are monthly means in m/s. The wind on any given day can differ from the monthly pattern, so check the forecast.
Every konbini, café and water stop OpenStreetMap lists along the line (1)
- パイナガマ海空すこやか公園bike-rentalkm 0.4
FAQ
Quick answers about miyako-bridgesよくある質問
How long is the miyako-bridges ride?
The miyako-bridges ride is 47.2 km with 234 m of climbing, by our route data from OpenStreetMap and a 30 m elevation model. The highest point is 81 m and the steepest 200 m averages 12.2%.
Book it
Line up the trip around Miyako-jima
Some of these links pay us a commission. It costs you nothing and keeps the guide independent.